Butler School of Music restores 43-year-old concert pipe organ 

Posted

The Butler School of Music’s Bates Recital Hall organ reunited with two of its pipes Nov. 5 after almost two years of absence due to renovations in Ohio.

Gregory Eaton, an organ and harpsichord lecturer, first noticed the dented pipes on the two-story mechanical action instrument 12 years ago, before he even began teaching at UT. When he was hired in 2019, he made restoring the organ his mission.

“When you walk into the concert hall, that’s what you see: this giant organ,” Eaton said. “If the organ looks bad, that’s a bad reflection on not just the Butler School of Music, but the University as a whole.”

Advertisement

One of six organs at UT, the 1983 organ is mainly used for concerts and advanced lessons. Its restoration began in January 2025 and was funded by donations from alumnus Mike Korte (history ‘89) and veteran organist Tim Wilborn.

“I’m thrilled,” Eaton said. “I’m able to use all of the stops, which I was not able to do when I first got here. And now with these pipes refurbished, it looks good when you enter the hall.”

Finding good quality repair services nearby was not easy. The best option was A.R. Schopp’s Sons in Alliance, Ohio, Eaton said.

“There’s a shortage of organ repair people in the United States,” Eaton said. “Most shops will not put you on their schedule until they physically have the pipes in hand.” 

Butler director Susan Thomas said she attributes the shortage of organ students in part to churches’ reduced use of traditional organs.

“I didn’t want to be one of those schools … where there’s a dead organ in the back of the concert hall, and everyone says, ‘Oh, how beautiful, when can I hear it?’” Thomas said. “And at (that) school, people say, ‘You can’t really, because it’s not playable.’” 

The restoration is part of a larger effort to address the Butler School’s deferred maintenance, Thomas said. After her hiring four years ago, she coordinated the push to improve its appearance, following delays caused by the COVID-19 pandemic.

In the first stage of renovations, the entire building was repainted, which, in many areas, had not been done since it was built around 1981, Thomas said. The floors were also replaced on all six levels. 

“We’re an academic building, but we’re also a public-facing building,” Thomas said. “That’s unusual compared to a lot of other spaces on campus.”

With around 500 public events a year, Thomas said maintaining a welcoming space for both students and the broader community is a priority.

Thomas said the Butler School faces funding challenges similar to those of other colleges on campus, but with additional burdens associated with its high traffic: a 425-person marching band, a children’s chamber music program during the summer and up to five concerts in busy weeks.

“There’s a lot of bodies passing through these spaces,” Thomas said.

Campus, Main story, News